• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 1. Equipment ECM, Harness Connector, and Retaining Hardware.
Figure 4. Equipment ECM, Mounting Bracket, and Retaining Hardware.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  934    935    936    937    938  939  940    941    942    943    944  
img
.
TM 5-2410-240-23-2
0148
REMOVAL CONTINUED
N OT E
Tag and mark electrical connectors to aid installation.
6. Remove screw (Figure 2, Item 2) retaining ground strap (Figure 2, Item 3) on equipment ECM (Figure 2,
Item 4).
7. Remove four bolts (Figure 2, Item 1) retaining equipment ECM (Figure 2, Item 4) on mounting bracket
(Figure 2, Item 6).
8. Remove one washer (Figure 2, Item 8), ground strap (Figure 2, Item 3), and four washers (Figure 2, Item 7)
from equipment ECM (Figure 2, Item 4).
9. Remove equipment ECM (Figure 2, Item 4) and four washers (Figure 2, Item 5) from mounting bracket
(Figure 2, Item 6).
Figure 2. Equipment ECM, Mounting Bracket, and Retaining Hardware.
0148
10. Remove eight isolators (Figure 3, Item 3) and four spacers (Figure 3, Item 1) from equipment ECM (Figure 3,
Item 2).
Figure 3. Equipment ECM, Isolators, and Spacers.
0148
END OF TASK
0148-3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.