• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 12. Machine ECM, Harness Connectors, and Retaining Hardware.
PLATFORM WIRING HARNESS REPLACEMENT (WITH RIPPER)

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  947    948    949    950    951  952  953    954    955    956    957  
img
. .
TM 5-2410-240-23-2
0149
INSTALLATION CONTINUED
N OT E
Install electrical connectors and tiedown straps as noted during removal.
10. Connect and lock platform harness (Figure 13, Item 3) to winch solenoid harness (Figure 13, Item 1).
11. Install new tiedown strap (Figure 13, Item 2) on platform harness (Figure 13, Item 3) and winch solenoid
harness (Figure 13, Item 1).
Figure 13. Platform Harness and Winch Solenoid Harness.
0149
12. Install batteries (WP 0142).
13. Program machine ECM (WP 0017).
END OF TASK
FOLLOW-ON TASKS
000149
Verify correct operation of machine (TM 5-2410-240-10).
END OF TASK
END OF WORK PACKAGE
0149-11/(12 blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.