• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 10. Cable Connections at Battery Disconnect Switch.
BATTERY REPLACEMENT - Continued

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  867    868    869    870    871  872  873    874    875    876    877  
img
.
16
TM 5-2410-240-23-2
0142
FIELD MAINTENANCE
-
BATTERY REPLACEMENT
01
42
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
References
Tools and Special Tools
0
0
Tool Kit, General Mechanic's
WP 0282
0
(WP 0289, Item 51)
0
Equipment Conditions
0
Gloves, Rubber (S0208)
Machine parked (TM 5-2410-240-10)
(WP 0289, Item 53)
0
0
Right rear access cover removed
Goggles (S0209)
(WP 0191)
(WP 0289, Item 53)
0
0
Drawings Required
Materials/Parts
0
0
TM 5-2410-240-24P, Figure 66
Rag, wiping (WP 0290, Item 21)
0
0
Tag, marker (WP 0290, Item 30)
Estimated Time to Complete
0
0
Tiedown strap (WP 0290, Item 31)
0
1.0 Hr
0
Locknut
0
Personnel Required
0
Two
0
0142-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.