• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 9. Cable Connections at Battery Disconnect Switch.
BATTERY REPLACEMENT

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  866    867    868    869    870  871  872    873    874    875    876  
img
. .
TM 5-2410-240-23-2
0141
INSTALLATION CONTINUED
N OT E
Install electrical connectors as noted during removal.
6. Install cable (Figure 10, Item 3), new lockwasher (Figure 10, Item 4), and nut (Figure 10, Item 5) on battery
disconnect switch (Figure 10, Item 2).
7. Install boot (Figure 10, Item 1) on cable (Figure 10, Item 3).
Figure 10. Cable Connections at Battery Disconnect Switch.
0141
END OF TASK
FOLLOW-ON TASKS
000141
1. Install batteries (WP 0142).
2. Verify correct operation of machine (TM 5-2410-240-10).
END OF TASK
END OF WORK PACKAGE
0141-10


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.