TM 5-2410-240-23-2
0150
INSTALLATION CONTINUED
N OT E
Install tiedown straps and electrical connectors as noted during removal.
22. Install two new tiedown straps (Figure 22, Item 5) on clips (Figure 22, Item 4) and harness (Figure 22, Item 3).
23. Install three new tiedown straps (Figure 22, Item 2) on bracket (Figure 22, Item 1) and harness (Figure 22,
Item 3).
24. Install new tiedown strap (Figure 22, Item 7) on harness (Figure 22, Item 3) and connector cap (Figure 22,
Item 6).
25. Connect two harness connectors (Figure 22, Item 10) to machine ECM (Figure 22, Item 8) and tighten screws
(Figure 22, Item 9).
Figure 22. Machine ECM Harness Connectors, Connector Cap, and Harness Retaining Hardware.
0150