• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 21. Harness Retaining Hardware Below Air Filter.
Figure 23. Harness Connector on Left Side of Junction Box.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  970    971    972    973    974  975  976    977    978    979    980  
img
.
TM 5-2410-240-23-2
0150
INSTALLATION CONTINUED
N OT E
Install tiedown straps and electrical connectors as noted during removal.
22. Install two new tiedown straps (Figure 22, Item 5) on clips (Figure 22, Item 4) and harness (Figure 22, Item 3).
23. Install three new tiedown straps (Figure 22, Item 2) on bracket (Figure 22, Item 1) and harness (Figure 22,
Item 3).
24. Install new tiedown strap (Figure 22, Item 7) on harness (Figure 22, Item 3) and connector cap (Figure 22,
Item 6).
25. Connect two harness connectors (Figure 22, Item 10) to machine ECM (Figure 22, Item 8) and tighten screws
(Figure 22, Item 9).
Figure 22. Machine ECM Harness Connectors, Connector Cap, and Harness Retaining Hardware.
0150
0150-23


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.