• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 25. Harness Grounds Above Junction Box.
Figure 28. Harness Connectors and Retaining Hardware Above Hydraulic Filters.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  974    975    976    977    978  979  980    981    982    983    984  
img
.
TM 5-2410-240-23-2
0150
INSTALLATION CONTINUED
30. Install clamp (Figure 26, Item 1) on harness (Figure 26, Item 5).
31. Install clamp (Figure 26, Item 1), washer (Figure 26, Item 2), and bolt (Figure 26, Item 4) on machine
(Figure 26, Item 3).
Figure 26. Harness Retaining Hardware Above Junction Box.
0150
N OT E
Install electrical connectors as noted during removal.
32. Connect platform harness (Figure 27, Item 3) to cab harness (Figure 27, Item 1) and tighten screw (Figure 27,
Item 2).
Figure 27. Harness Connectors Near Left Top of Machine ECM.
0150
0150-27


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.