• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 26. Harness Retaining Hardware Above Junction Box.
HORN WIRING HARNESS REPLACEMENT

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  975    976    977    978    979  980  981    982    983    984    985  
img
. .
TM 5-2410-240-23-2
0150
INSTALLATION CONTINUED
N OT E
Install electrical connectors as noted during removal.
33. Connect platform harness (Figure 28, Item 3) to chassis harness (Figure 28, Item 2) and tighten screw
(Figure 28, Item 4).
34. Install clamp (Figure 28, Item 8) on harness (Figure 28, Item 7).
35. Install clamp (Figure 28, Item 8), washer (Figure 28, Item 6), and bolt (Figure 28, Item 5) on machine
(Figure 28, Item 9).
36. Connect and lock platform harness (Figure 28, Item 10) to chassis harness (Figure 28, Item 1).
Figure 28. Harness Connectors and Retaining Hardware Above Hydraulic Filters.
0150
END OF TASK
FOLLOW-ON TASKS
000150
1. Install left rear access panel (WP 0193).
2. Install right rear access panel (WP 0190).
3. Install right lower door hinge (WP 0255).
4. Install left lower door hinge (WP 0255).
5. Install front floor plate (WP 0205).
6. If arctic kit heater equipped, install arctic kit heater switch and heater harness (WP 0277).
7. Install batteries (WP 0142).
8. Verify correct operation of machine (TM 5-2410-240-10).
END OF TASK
END OF WORK PACKAGE
0150-28


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.