• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 6. Chassis Harness Retaining Hardware Above Engine ECM and Behind Left Rear of Engine.
FUEL TANK AND CHASSIS WIRING HARNESS REPLACEMENT (WITH RIPPER)

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  988    989    990    991    992  993  994    995    996    997    998  
img
.
TM 5-2410-240-23-2
0152
INSTALLATION CONTINUED
10. Install two grommets (Figure 7, Item 1) on chassis harness (Figure 7, Item 4) and hood support (Figure 7,
Item 5).
11. Connect two connectors (Figure 7, Item 2) and install tiedown strap (Figure 7, Item 3) on connectors.
Figure 7. Chassis Harness Underneath Hood.
0152
END OF TASK
FOLLOW-ON TASKS
000152
1. Install hood support (WP 0188).
2. Install hood (WP 0186).
3. Install debris guards (WP 0187).
4. Install right engine access panel (WP 0182).
5. Install left engine access panel (WP 0184).
6. Verify correct operation of machine (TM 5-2410-240-10).
END OF TASK
END OF WORK PACKAGE
0152-7/(8 blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.