26
TM 5-2410-240-23-2
FIELD MAINTENANCE
-
FUEL TANK AND CHASSIS WIRING HARNESS REPLACEMENT (WITH RIPPER)
0
153
Removal, Cleaning and Inspection, Installation
Effectivity Notice (with Ripper)
INITIAL SETUP
Equipment Conditions - Continued
Tools and Special Tools
0
0
Tool Kit, General Mechanic's
Fuel tank guard removed (WP 0194)
0
(WP 0289, Item 51)
Debris guards removed (WP 0187)
0
0
Right rear access panel removed
Materials/Parts
0
(WP 0190)
0
Rag, wiping (WP 0290, Item 21)
0
Left rear access panel removed (WP 0193)
0
Tag, marker (WP 0290, Item 30)
0
Rear and center bottom guards removed
Tiedown strap (WP 0290, Item 31)
0
0
References
Drawings Required
0
0
WP 0282
TM 5-2410-240-24P, Figure 65
0
0
Equipment Conditions
Estimated Time to Complete
0
0
Machine parked (TM 5-2410-240-10)
1.5 Hr
0
0
0
0153-1