• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 1. Chassis and Engine Harness and Retaining Hardware at Top of Hood Support.
Figure 3. Chassis and Engine Harness Retainers Below Ether Aid.

Field Maintenance Manual 3 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  123    124    125    126    127  128  129    130    131    132    133  
img
. .
TM 5-2410-240-23-3
0188
REMOVAL CONTINUED
4. If not arctic kit heater equipped, remove ether bottle, ether valve, and retaining bracket (WP 0048).
5. If arctic kit heater equipped, remove arctic kit heater and bracket (WP 0278).
6. Install lifting device on hood support (Figure 2, Item 1).
N OT E
Mark position of bolts on hood support and position of hood support on brackets to aid
installation.
Do not remove bolts at this time.
7. Loosen six bolts (Figure 2, Item 3) and position two brackets (Figure 2, Item 2) aside.
8. Remove six bolts (Figure 2, Item 5) and washers (Figure 2, Item 4) retaining hood support (Figure 2, Item 1) on
brackets (Figure 2, Item 2).
9. Pivot hood support (Figure 2, Item 1) forward.
Figure 2. Hood Support and Retaining Hardware.
0188
0188-3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.