• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 13. Left Front Cab Mount Cover.
Figure 16. Cab Floor Plate Harness Connection.

Field Maintenance Manual 3 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  574    575    576    577    578  579  580    581    582    583    584  
img
.
TM 5-2410-240-23-3
0232
INSTALLATION CONTINUED
24. Install two spacers (Figure 14, Item 5), bracket (Figure 14, Item 4), clamp (Figure 14, Item 1), washer
(Figure 14, Item 3), and bolt (Figure 14, Item 2) on operator platform (Figure 14, Item 6).
Figure 14. Wiring Harness Clamp.
0232
25. Install two hoses (Figure 15, Item 6) and clamps (Figure 15, Item 5) on valves (Figure 15, Item 4).
26. Remove coolant container from under hoses (Figure 15, Item 6).
27. Turn two levers (Figure 15, Item 3) to ON position at valves (Figure 15, Item 4).
28. Connect two A/C hoses (Figure 15, Item 1) on A/C hoses (Figure 15, Item 2).
Figure 15. Plenum Connections.
0232
0232-14


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.