• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 1. Arctic Kit Troubleshooting Procedures for the D6K Dozer - Continued.
ARCTIC HEATER FUEL FLOW TEST

Field Maintenance Manual 3 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1049    1050    1051    1052    1053  1054  1055    1056    1057    1058    1059  
img
. .
TM 5-2410-240-23-3
0273
Table 1. Arctic Kit Troubleshooting Procedures for the D6K Dozer - Continued.
0273
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
4. ARCTIC KIT HEATER DOES  11. Using digital multimeter,
Voltage OK - Replace arctic kit
NOT TURN ON CONTINUED
test for voltage between
heater (WP 0278). Then ensure all
wiring harness connector
harness connectors are
HW-C4 (WP 0018,
reconnected.
Figure 192) terminal 1 and
Voltage NOT OK - Replace arctic
machine ground.
kit heater wiring harness
Voltage should be between
(WP 0277). Then ensure all
18 and 26 volts.
harness connectors are
reconnected.
END OF WORK PACKAGE
0273-14


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.