TM 5-2410-240-23-3
0273
Table 1. Arctic Kit Troubleshooting Procedures for the D6K Dozer - Continued.
0273
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
4. ARCTIC KIT HEATER DOES 6. Disconnect wiring harness
NOT TURN ON CONTINUED
connector HW-C1
(WP 0018, Figure 189)
from wiring harness
connector PL-C7 (WP
0018, Figure 220).
7. Turn battery disconnect
switch to ON position (TM
5-2410-240-10).
Voltage OK - Replace arctic kit
test for voltage between
wiring harness connector
Then ensure all harness connectors
PL-C7 (WP 0018, Figure
are reconnected.
220) terminal 1 and
Voltage Not OK - Proceed to
machine ground.
step 9.
Voltage should be between 18
and 26 volts.
9. Turn battery disconnect
switch to OFF position (TM
5-2410-240-10).
10. Disconnect platform wiring
harness connector PL-C3
(WP 0018, Figure 216)
from fuse panel connector
FP-C3 (Figure 168).
test for continuity between
breaker panel wiring harness
wiring harness connector
PL-C3 (WP 0018, Figure
harness connectors are
216) terminal 6 and wiring
reconnected.
harness connector PL-C7
(WP 0018, Figure 220)
wiring harness (WP 0150 or
terminal 1.
WP 0155). Then ensure all harness
connectors are reconnected.
Test Step 5 - Test Ground
Circuit For Open.
1. Turn battery disconnect
switch to OFF position
(TM 5-2410-240-10).
2. Disconnect wiring harness
connector HW-C3 (WP
0018, Figure 191) from wir-
ing harness connector AH-
C2 (WP 0018, Figure 5).
0273-11