40
TM 5-2410-240-23-3
FIELD MAINTENANCE
-
PREPARATION FOR TRANSPORT
0284
Preparation for Highway and OCONUS Rail Transport; Preparation for CONUS Rail Transport;
Preparation for Marine Transport; Preparation for Air Transport; Preparation for Airdrop;
Dozer Blade Stowage/Unstowage; ROPS/FOPS Removal, Installation; Preparing Powertrain for Airdrop;
Restoring Powertrain After Airdrop; Restoring Machine After TransportAll Transport Methods;
Follow-On Tasks; Data Plates for Shipping
INITIAL SETUP
Materials/Parts - Continued
Tools and Special Tools
0
0
Handle, Ratchet, 3/4" Drive, 17" Long (S0374)
0
0
0
Handle, Sliding T, 3/4" Drive,
0
0
Personnel Required
Socket, Impact, 3/4" Drive, 6 Point,
0
Three
0
0
Screwdriver Attachment, Torx, 3/8" Drive,
References
0
0
FM 55-30
Wrench, Combination, 1-7/16" (S0792)
0
Equipment Conditions
0
0
Wrench, Combination, 1-13/16" (S0797)
Machine parked on level ground (TM 5-2410-
0
240-10)
0
Wrench, Combination, 1-1/4" (S0789)
Battery disconnect switch ON (TM 5-2410-
0
240-10)
0
BII (TM 5-2410-240-10)
0
Cold start ether cylinder removed
Lifting device (6,000-lb capacity)
(TM 5-2410-240-10)
0
0
Lifting device (40,000-lb capacity)
0
Estimated Time to Complete
4x4-inch wooden post36 inches long (2)
0
0
2.5 Hr
0
Materials/Parts
0
0
0284-1