• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PREPARATION FOR CONUS RAIL TRANSPORT
PREPARATION FOR MARINE TRANSPORT

Field Maintenance Manual 3 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1169    1170    1171    1172    1173  1174  1175    1176    1177    1178    1179  
img
.
TM 5-2410-240-23-3
0284
PREPARATION FOR CONUS RAIL TRANSPORT CONTINUED
Figure 3. Lift Points.
0284
9. Lift dozer and place on railcar.
10. Remove slings and lifting device.
11. Start engine (TM 5-2410-240-10).
12. Once dozer is in position, angle dozer blade as far left as possible, reducing total width of machine
(TM 5-2410-240-10).
13. Lower blade on wood blocks on railcar deck and apply slight downward pressure (TM 5-2410-240-10).
14. Apply parking brake and stop engine (TM 5-2410-240-10).
15. Provide assistance, as required, in blocking/shoring/lashing machine for transport in accordance with shipping
data plate.
Figure 4. Tie Down Locations.
0284
END OF TASK
0284-5


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.