PREPARATION FOR AIR TRANSPORT
Figure 8. Dozer Blade Retainers.

Field Maintenance Manual 3 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1173    1174    1175    1176    1177  1178  1179    1180    1181    1182    1183  
img
.
TM 5-2410-240-23-3
0284
PREPARATION FOR AIRDROP CONTINUED
.
Figure 6. Tie Down Locations.
0284
10. Check stability of machine on airdrop platform. Ensure all blocking and shoring is properly installed and
secured to platform with nails.
11. Rig machine for airdrop by parachute IAW data plate for shipping.
Figure 7. Parachute Attachment Locations.
0284
12. Ensure all machine compartment doors are properly closed and latched.
13. Load platform into C-130 aircraft.
END OF TASK
0284-9