• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 6. Tie Down Locations.
Figure 9. Retaining Arm Installation.

Field Maintenance Manual 3 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1174    1175    1176    1177    1178  1179  1180    1181    1182    1183    1184  
img
.
TM 5-2410-240-23-3
0284
DOZER BLADE STOWAGE/UNSTOWAGE
000284
Stowage
000284
1. Start engine (TM 5-2410-240-10).
2. Raise dozer blade approximately 5 in. (125 mm) above ground (TM 5-2410-240-10).
3. Stop engine (TM 5-2410-240-10).
4. Remove two retainer pins (Figure 8, Item 3) and pins (Figure 8, Item 2) from blade (Figure 8, Item 1). Retain
pins for reuse.
Figure 8. Dozer Blade Retainers.
0284
5. Remove two retainer pins (Figure 8, Item 4) and retaining arm (Figure 8, Item 5) from blade (Figure 8, Item 1).
Retain pins for reuse.
6. Reinstall retainer pins (Figure 8, Item 4) in holes on retaining arm (Figure 8, Item 5) mounting posts.
7. Manually fold left side of blade forward.
0284-10


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.