• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 12. Door Hinge Bolts.
Figure 14. Air Conditioning Hose Connections.

Field Maintenance Manual 3 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1179    1180    1181    1182    1183  1184  1185    1186    1187    1188    1189  
img
.
TM 5-2410-240-23-3
0284
ROPS/FOPS REMOVAL, INSTALLATION CONTINUED
Figure 13. Door Shipping Brackets.
0284
13. Install adjustable striker bracket (Figure 13, Item 1) to both door latches.
14. Tighten all fasteners (Figure 13, Item 3) and adjust striker bracket (Figure 13, Item 1) so that doors are firmly
secured.
15. Using straps, secure doors to shipping platform.
0284-15


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.