TM 5-2410-241-10
0012
Table 1. Preventive Maintenance Checks and Services (PMCS) - Continued.
0012
LOCATION
ITEM TO
CHECK/
NOT FULLY MISSION
ITEM
MAN-
SERVICE
PROCEDURE
CAPABLE IF:
NO.
INTERVAL HOURS
66
Weekly
Track Pins and
WARN I N G
Bushings
Track pins and bushings can become very hot to the touch
if joint is dry (lacking lubrication). It is possible to burn skin
if there is more than brief contact with these components.
Failure to follow this warning may result in injury to
personnel.
C AU T I O N
This inspection must be performed as soon as the machine
is shut down. If not done immediately, track pins and
bushings will cool down and not provide accurate
inspection results.
a. Check each pin and bushing on Pin and bushing damaged.
both track assemblies for excessive
heat.
b. Mark pins that exhibit excessive
heat. Notify Field Maintenance.
Figure 27. Track Pin and Bushing Inspection.
0012