AFTERCOOLER PUMP INLET HOSES AND PIPE INSTALLATION CONTINUED
5. Install clamp (Figure 20, Item 5) and clamp (Figure 20, Item 1) on hose (Figure 20, Item 3).
6. Install hose (Figure 20, Item 3) on pipe (Figure 20, Item 4) and aftercooler pump (Figure 20, Item 2).
7. Tighten clamp (Figure 20, Item 5) and clamp (Figure 20, Item 1) on hose (Figure 20, Item 3).
8. Install engine enclosure left door guard (WP 0202).
Figure 20. Aftercooler Pump Hose.
0051
END OF TASK
FOLLOW-ON TASKS
00051
1. Fill cooling system (WP 0113).
2. Install front engine bottom guards (WP 0199).
3. Verify correct operation of machine (TM 5-2410-241-10).
END OF TASK