REMOVAL CONTINUED
N OT E
Note harness routing to aid installation.
Tag and mark all electrical connections to aid installation.
Note number and location of tiedown straps to aid installation.
Hydraulic lines and drive shaft removed in picture below for clarity.
27. Remove tiedown straps (Figure 11, Item 4) from engine main harness (Figure 11, Item 3). Discard tiedown
straps.
28. Disconnect engine main harness connector (Figure 11, Item 5) from torque converter oil temperature sender
connector (Figure 11, Item 6).
29. Disconnect engine main harness connector (Figure 11, Item 1) from torque converter output speed sensor
connector (Figure 11, Item 2).
30. Remove engine main harness (Figure 11, Item 3) from machine.
Figure 11. Torque Converter Connections.
0055
END OF TASK
CLEANING AND INSPECTION
00055
Clean and inspect all parts IAW Mechanical General Maintenance Instructions (WP 0295).
END OF TASK