• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 5. Underhood Work Light Connection.
Figure 7. Ether Aid Solenoid Connection.

Field Maintenance Manual 1 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1172    1173    1174    1175    1176  1177  1178    1179    1180    1181    1182  
img
.
TM 5-2410-241-23-1
0055
REMOVAL CONTINUED
N OT E
Note harness routing to aid installation.
Tag and mark all electrical connections to aid installation.
Note number and location of tiedown straps to aid installation.
12. Disconnect engine main harness connector (Figure 6, Item 5) from ether aid relay (Figure 6, Item 3).
13. Remove tiedown straps (Figure 6, Item 9) from platform connectors (Figure 6, Items 1 and 7). Discard tiedown
straps.
14. Disconnect engine main harness connector (Figure 6, Item 8) from platform connector (Figure 6, Item 7).
15. Remove engine main harness connector (Figure 6, Item 6) and platform connector (Figure 6, Item 1) from
bracket (Figure 6, Item 2).
16. Loosen bolt (Figure 6, Item 4) and disconnect engine main harness connector (Figure 6, Item 6) from platform
connector (Figure 6, Item 1).
Figure 6. Platform Harness Connections.
0055
0055-6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.