• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ENGINE MAIN WIRING HARNESS ASSEMBLY REPLACEMENT
Figure 3. Starter Solenoid Connection.

Field Maintenance Manual 1 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1168    1169    1170    1171    1172  1173  1174    1175    1176    1177    1178  
img
.
TM 5-2410-241-23-1
0055
REMOVAL
00055
N OT E
Note harness routing to aid installation.
Tag and mark all electrical connections to aid installation.
Note number and location of tiedown straps to aid installation.
1. Disconnect engine main harness connector (Figure 1, Item 2) from front lighting harness connector (Figure 1,
Item 1).
2. Remove tiedown straps (Figure 1, Item 3) from engine main harness (Figure 1, Item 2). Discard tiedown
straps.
Figure 1. Radiator Harness Connector.
0055
N OT E
Note harness routing to aid installation.
Tag and mark all electrical connections to aid installation.
3. Remove nut (Figure 2, Item 5), ground strap (Figure 2, Item 4), two ground cables (Figure 2, Item 3) and
connectors (Figure 2, Item 2) from starter (Figure 2, Item 1).
Figure 2. Starter Ground Connections.
0055
0055-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.