• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 8. NATO Slave Cables.
INLET TEMPERATURE SENSOR HARNESS REPLACEMENT

Field Maintenance Manual 1 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1164    1165    1166    1167    1168  1169  1170    1171    1172    1173    1174  
img
.
TM 5-2410-241-23-1
0053
NATO SLAVE INSTALLATION CONTINUED
7. Install NATO slave cap (Figure 9, Item 2) on NATO slave (Figure 9, Item 1).
8. Install tether (Figure 9, Item 5), washer (Figure 9, Item 3) and screw (Figure 9, Item 4) on NATO slave cap
(Figure 9, Item 2).
Figure 9. NATO Slave Cap.
0053
END OF TASK
FOLLOW-ON TASKS
00053
1. Install engine enclosure left door guard (WP 0202).
2. Verify correct operation of machine (TM 5-2410-240-10).
END OF TASK
END OF WORK PACKAGE
0053-10


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.