• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 4. NATO Slave Cables and Clamp.
Figure 6. NATO Slave Cables and Clamp.

Field Maintenance Manual 1 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1160    1161    1162    1163    1164  1165  1166    1167    1168    1169    1170  
img
.
TM 5-2410-241-23-1
0053
NATO SLAVE CABLE REMOVAL CONTINUED
N OT E
Note routing cables and tag electrical connectors to aid installation.
5. Remove front engine bottom guard (WP 0199).
6. Remove nut (Figure 5, Item 2) and positive cable (Figure 5, Item 1) from starter (Figure 5, Item 5).
7. Remove nut (Figure 5, Item 3) and negative cable (Figure 5, Item 4) from starter (Figure 5, Item 5).
8. Remove positive cable (Figure 5, Item 1) and negative cable (Figure 5, Item 4) from machine.
Figure 5. Starter Cable Connections.
0053
END OF TASK
CLEANING AND INSPECTION
00053
Clean and inspect all parts IAW Mechanical General Maintenance Instructions (WP 0295).
END OF TASK
0053-6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.