TM 5-2410-241-23-2
0057
ENGINE REMOVAL
00057
N OT E
Cap and plug all hoses, lines and tubesto prevent contamination and leaks.
Tag and mark all hoses to aid installation.
1. Remove four bolts (Figure 1, Item 3), washers (Figure 1, Item 4), split flange clamp (Figure 1, Item 6), hose
(Figure 1, Item 2), and O-ring (Figure 1, Item 5) from cooler line (Figure 1, Item 7). Discard O-ring.
2. Remove four bolts (Figure 1, Item 12), washers (Figure 1, Item 11), split flange clamp (Figure 1, Item 10), hose
(Figure 1, Item 1), O-ring (Figure 1, Item 9), and screen (Figure 1, Item 13) from torque converter (Figure 1,
Item 8). Discard O-ring.
Figure 1. Torque Converter Hoses.
0057