TM 5-2410-241-23-2
0057
ENGINE INSTALLATION CONTINUED
N OT E
Move engine downward then rearward in order to clear the cab and powertrain oil cooler.
2. Install engine (Figure 47, Item 1) on machine.
3. Install two new O-rings (Figure 47, Item 6) on flange (Figure 47, Item 5).
4. Install flange (Figure 47, Item 5), two washers (Figure 47, Item 4) and bolts (Figure 47, Item 3) on torque
converter housing (Figure 47, Item 2).
Figure 47. Engine Assembly.
0057