• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 52. Alternator Cable.
Figure 54. Platform Harness Connections.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  48    49    50    51    52  53  54    55    56    57    58  
img
.
TM 5-2410-241-23-2
0057
ENGINE INSTALLATION CONTINUED
N OT E
Install hoses as tagged and marked during removal.
13. Install clamp (Figure 53, Item 3), two washers (Figure 53, Item 2) and bolts (Figure 53, Item 1) on hose bundle
(Figure 53, Item 4).
Figure 53. Hose Bundle Clamps.
0057
0057-53


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.