• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 50. Engine Lifting Device.
Figure 53. Hose Bundle Clamps.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  47    48    49    50    51  52  53    54    55    56    57  
img
.
TM 5-2410-241-23-2
0057
ENGINE INSTALLATION CONTINUED
N OT E
Install hoses as tagged and marked during removal.
Install tiedown straps as noted during removal.
9. Install alternator cable (Figure 52, Item 10), two washers (Figure 52, Item 3) and nut (Figure 52, Item 2) on
alternator (Figure 52, Item 1).
10. Install boot (Figure 52, Item 4) on nut (Figure 52, Item 2).
11. Install bracket (Figure 52, Item 6), clamp (Figure 52, Item 9), washer (Figure 52, Item 8) and bolt (Figure 52,
Item 7) on alternator bracket (Figure 52, Item 5).
12. Install two clamps (Figure 52, Item 13), washers (Figure 52, Item 11), and new locknuts (Figure 52, Item 12) on
alternator cable (Figure 52, Item 10).
Figure 52. Alternator Cable.
0057
0057-52


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.