• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 56. Valve and Fitting.
Figure 58. Rear Engine Harness.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  121    122    123    124    125  126  127    128    129    130    131  
img
.
TM 5-2410-241-23-2
0059
INSTALLATION CONTINUED
N OT E
Install fitting and valve as noted during removal.
74. Install fitting (Figure 57, Item 5) and valve (Figure 57, Item 4) on water pump elbow (Figure 57, Item 6).
75. Install hose (Figure 57, Item 7) and clamp (Figure 57, Item 3) on fitting (Figure 57, Item 4).
76. Install two P-clips (Figure 57, Items 9 and 12), washer (Figure 57, Item 10), bolt (Figure 57, Item 11), washer
(Figure 57, Item 8) and nut (Figure 57, Item 1) on line (Figure 57, Item 2).
Figure 57. Water Pump Elbow.
0059
0059-57


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.