• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 5. Ether Valve.
Figure 7. Ether Valve.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  134    135    136    137    138  139  140    141    142    143    144  
img
.
TM 5-2410-241-23-2
0060
ETHER VALVE AND BOTTLE SUPPORT BRACKET REMOVAL
00060
1. Loosen clamp (Figure 6, Item 4) from bottle (Figure 6, Item 5).
2. Remove bottle (Figure 6, Item 5) from ether valve (Figure 6, Item 7) and clamp (Figure 6, Item 4).
3. Loosen tube nut (Figure 6, Item 9) and remove line (Figure 6, Item 10) from fitting (Figure 6, Item 8).
4. Remove two bolts (Figure 6, Item 12), washers (Figure 6, Item 13), and clamps (Figure 6, Item 11) from line
(Figure 6, Item 10). Position line aside.
5. Remove two bolts (Figure 6, Item 2), washers (Figure 6, Item 3), clip (Figure 6, Item 1), and clamp (Figure 6,
Item 4) from bracket (Figure 6, Item 6). Position clip and harness (Figure 6, Item 14) aside.
Figure 6. Ether Bottle and Line.
0060
0060-7


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.