6
TM 5-2410-241-23-2
FIELD MAINTENANCE
-
ENGINE ECM SERVICE
01
01
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Tools and Special Tools
Equipment Condition
0
0
Tool Kit, General Mechanic's
Machine parked (TM 5-2410-241-10)
0
(WP 0302, Item 65)
0
Engine enclosure left door guard removed
(WP 0202)
0
Materials/Parts
0
Drawing Required
0
Rag, Wiping (WP 0303, Item 24)
0
Tag, Marker (WP 0303, Item 34)
0
TM 5-2410-241-24P, Figure 16
0
References
Estimated Time to Complete
0
0
1.5 Hr
WP 0017
0
0
WP 0295
0
0101-1