• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 6. Hydrostatic Drive Motor.
GEAR PUMP SERVICE

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  703    704    705    706    707  708  709    710    711    712    713  
img
.
TM 5-2410-241-23-2
0140
INSTALLATION CONTINUED
N OT E
Install hoses as noted during removal.
8. Install hose (Figure 7, Item 5) on hydrostatic drive pump (Figure 7, Item 7) and tighten tube nut (Figure 7,
Item 6).
9. Position two hoses (Figure 7, Item 1) and install tee (Figure 7, Item 2) on elbow fitting (Figure 7, Item 4).
Tighten nut (Figure 7, Item 3).
Figure 7. Hydraulic Hoses.
0140
END OF TASK
FOLLOW-ON TASKS
000140
1. Install counterbalance valve (WP 0217).
2. Install bottom guards (WP 0199).
3. Verify correct operation of machine (TM 5-2410-241-10).
END OF TASK
END OF WORK PACKAGE
0140-8


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.