• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 13. Cab Lifting Device Setup.
Figure 16. Bell and Tube.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  715    716    717    718    719  720  721    722    723    724    725  
img
.
TM 5-2410-241-23-2
0141
INSTALLATION CONTINUED
13. Install new O-ring (Figure 15, Item 5) on temperature sensor probe (Figure 15, Item 2).
14. Install temperature sensor probe (Figure 15, Item 2) on pump (Figure 15, Item 1).
15. Connect temperature sensor connector (Figure 15, Item 3) to wiring harness (Figure 15, Item 4).
Figure 15. Temperature Sensor.
0141
0141-12


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.