• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 29. Wiring Harness.
Figure 32. Tube Seals.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  785    786    787    788    789  790  791    792    793    794    795  
img
.
TM 5-2410-241-23-2
0148
INSTALLATION CONTINUED
N OT E
Install hoses as noted during removal.
36. Install new O-ring (Figure 31, Item 7) on hose (Figure 31, Item 10).
37. Position line (Figure 31, Item 3) and spacer (Figure 31, Item 8) on torque converter housing (Figure 31,
Item 11).
38. Install new O-ring (Figure 31, Item 9), spacer (Figure 6, Item 8), hose (Figure 31, Item 10), two split clamps
(Figure 31, Item 4), four washers (Figure 31, Item 6), and bolts (Figure 31, Item 5) on torque converter housing
(Figure 31, Item 11).
39. Install new O-ring (Figure 31, Item 2) on hose (Figure 31, Item 1).
40. Install hose (Figure 31, Item 1) and tube nut (Figure 31, Item 12) on torque converter housing (Figure 31,
Item 11).
Figure 31. Hose Assemblies.
0148
0148-24


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.