• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 31. Hose Assemblies.
Figure 34. Tube to Torque Converter Housing.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  786    787    788    789    790  791  792    793    794    795    796  
img
.
TM 5-2410-241-23-2
0148
INSTALLATION CONTINUED
N OT E
Install seals as noted during removal.
41. Install three new seals (Figure 32, Item 1) on two transmission cooler tubes (Figure 32, Item 4).
N OT E
Clearance does not allow bolts to install with transmission cooler tube on machine. Bolts
will be installed with transmission cooler tube.
42. Position four washers (Figure 32, Item 2) and bolts (Figure 32, Item 3) on transmission cooler tube (Figure 32,
Item 4).
Figure 32. Tube Seals.
0148
0148-25


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.