• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 10. Front Connector.
BATTERY REPLACEMENT

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  818    819    820    821    822  823  824    825    826    827    828  
img
.
TM 5-2410-241-23-2
0154
FRONT FLOOD LAMP HARNESS INSTALLATION CONTINUED
13. Close two doors (Figure 11, Item 1) on machine.
14. With assistance, slightly lift doors (Figure 11, Item 1) up from hinges (Figure 11, Item 4).
15. Install eight washers (Figure 11, Item 3) and bolts (Figure 11, Item 2) on machine.
Figure 11. Doors.
0154
END OF TASK
FOLLOW-ON TASKS
000154
Verify correct operation of machine (TM 5-2410-241-10).
END OF TASK
END OF WORK PACKAGE
0154-11/(12 blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.