TM 5-2410-241-23-2
0156
INSTALLATION CONTINUED
6. Install battery box (Figure 11, Item 5), three washers (Figure 11, Item 2), and bolts (Figure 11, Item 1) on
fender.
7. Install three washers (Figure 11, Item 4) and bolts (Figure 11, Item 3) inside battery box (Figure 11, Item 5).
Figure 11. Battery Box.
0156
8. Install knob (Figure 12, Item 2) on battery disconnect door (Figure 12, Item 3).
9. Install washer (Figure 12, Item 4) and new cotter pin (Figure 12, Item 1) on knob (Figure 12, Item 2).
Figure 12. Battery Disconnect Door.
0156
0156-10