Figure 12. Battery Positive Cable.
BATTERY GROUND CABLE REPLACEMENT

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  880    881    882    883    884  885  886    887    888    889    890  
img
.
TM 5-2410-241-23-2
0159
BATTERY POSITIVE TO JUNCTION BLOCK INSTALLATION CONTINUED
8. Close battery cover (Figure 13, Item 1) and secure two rubber latches (Figure 13, Item 2) on battery box.
Figure 13. Battery Box.
0159
END OF TASK
FOLLOW-ON TASKS
000159
1. Install front floor plates (WP 0230).
2. Verify correct operation of machine (TM 5-2410-241-10).
END OF TASK
END OF WORK PACKAGE
0159-14