• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 10. Clamps.
Figure 12. Battery Positive Cable.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  878    879    880    881    882  883  884    885    886    887    888  
img
.
TM 5-2410-241-23-2
0159
BATTERY POSITIVE TO JUNCTION BLOCK INSTALLATION
000159
N OT E
Install clamps as noted during removal.
1. Install positive battery cable (Figure 11, Item 4) on machine.
2. Install two clamps (Figure 11, Item 1), washers (Figure 11, Item 3), and nuts (Figure 11, Item 2) on positive
battery cable (Figure 11, Item 4).
N OT E
Install electrical connections and cable as noted during removal.
3. Install positive battery cable (Figure 11, Item 4), washer (Figure 11, Item 6), and nut (Figure 11, Item 7) on
junction box (Figure 11, Item 5).
4. Position cover (Figure 11, Item 8) over nut (Figure 11, Item 7).
Figure 11. Battery Positive Cable to Junction Box.
0159
0159-12


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.