BATTERY POSITIVE TO JUNCTION BLOCK INSTALLATION CONTINUED
N OT E
Install cable as noted during removal.
5. Install positive battery cable (Figure 12, Item 1) on batteries (Figure 12, Item 2).
6. Install two clamps (Figure 12, Item 3) and nuts (Figure 12, Item 5) on batteries (Figure 12, Item 2).
7. Position two covers (Figure 12, Item 4) over nuts (Figure 12, Item 5).
Figure 12. Battery Positive Cable.