• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 11. Arctic Kit Battery Cable.
BATTERY CROSSOVER CABLE REPLACEMENT

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  893    894    895    896    897  898  899    900    901    902    903  
img
.
TM 5-2410-241-23-2
0160
BATTERY GROUND TO DISCONNECT SWITCH CABLE INSTALLATION CONTINUED
10. With assistance, install cover (Figure 12, Item 1) and secure two latches (Figure 12, Item 2) on machine.
Figure 12. Arctic Kit Battery Cover.
0160
END OF TASK
FOLLOW-ON TASKS
000160
Verify correct operation of machine (TM 5-2410-241-10).
END OF TASK
END OF WORK PACKAGE
0160-13/(14 blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.