• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 8. Switch Cable.
Figure 10. Battery Box.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  890    891    892    893    894  895  896    897    898    899    900  
img
.
TM 5-2410-241-23-2
0160
BATTERY GROUND TO DISCONNECT SWITCH CABLE INSTALLATION
000160
N OT E
Install electrical connections and route cable as noted during removal.
1. Install battery ground cable (Figure 9, Item 5), washer (Figure 9, Item 8), and nut (Figure 9, Item 9) on battery
disconnect switch (Figure 9, Item 7).
2. Position cover (Figure 9, Item 6) over nut (Figure 9, Item 9).
3. Position battery ground cable (Figure 9, Item 5) on batteries (Figure 9, Item 1).
4. Install two clamps (Figure 9, Item 4) and tighten nuts (Figure 9, Item 3) on batteries (Figure 9, Item 1).
5. Position two covers (Figure 9, Item 2) on clamps (Figure 9, Item 4).
Figure 9. Battery Cable.
0160
0160-10


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.