• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2. Battery Cable.
Figure 4. Battery Box.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  897    898    899    900    901  902  903    904    905    906    907  
img
.
TM 5-2410-241-23-2
0161
INSTALLATION
000161
N OT E
Steps 1 - 4 will install one battery crossovercable. Follow same steps for additional battery
crossover cable.
Install electrical connections an cable as noted during removal.
d
1. Install cable (Figure 3, Item 2) on batteries (Figure 3, Item 5).
2. Install clamps (Figure 3, Item 4) on batteries (Figure 3, Item 5).
3. Tighten two nuts (Figure 3, Item 3) on clamps (Figure 3, Item 4).
4. Position two covers (Figure 3, Item 1) on clamps (Figure 3, Item 4).
Figure 3. Battery Cable.
0161
0161-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.