• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
JUNCTION BLOCK REPLACEMENT (WITH ARCTIC KIT HEATER) - Continued
Figure 2. Doors.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  930    931    932    933    934  935  936    937    938    939    940  
img
. .
8
TM 5-2410-241-23-2
0167
FIELD MAINTENANCE
-
FRONT LIGHTING HARNESS REPLACEMENT
01
67
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Equipment Condition
Tools and Special Tools
0
0
Tool Kit, General Mechanic's
Machine parked (TM 5-2410-241-10)
0
(WP 0302, Item 65)
Lefts side engine enclosure door guard
0
removed (WP 0202)
0
Materials/Parts
0
Drawing Required
Rag, Wiping (WP 0303, Item 24)
0
0
Tag, Marker (WP 0303, Item 34)
TM 5-2410-241-24P, Figure 86, 96
0
0
Tiedown Strap (WP 0303, Item 36)
0
Estimated Time to Complete
0
3.5 Hr
References
0
0
WP 0295
0
REMOVAL
000167
N OT E
Tag and mark electrical connectors to aid installation.
Note harness routing to aid installation.
1. Remove tiedown straps (Figure 1, Item 3) from harness (Figure 1, Item 4). Discard tiedown straps.
2. Disconnect connector (Figure 1, Item 1) from connector (Figure 1, Item 2).
3. Position harness (Figure 1, Item 4) aside.
Figure 1. Frame Connector.
0167
0167-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.