TM 5-2410-241-23-2
0173
INSTALLATION CONTINUED
N OT E
Install electrical connections and route harness as noted during removal.
4. Install new gasket (Figure 8, Item 1), plate (Figure 8, Item 5), and two bolts (Figure 8, Item 7) on transmission
(Figure 8, Item 8).
5. Position harness (Figure 8, Item 3) in transmission (Figure 8, Item 8).
6. Install new O-ring (Figure 8, Item 2) on main connector (Figure 8, Item 4).
7. Install connector (Figure 8, Item 4) on plate (Figure 8, Item 5).
8. Install nut (Figure 8, Item 6) on main connector (Figure 8, Item 4).
Figure 8. Transmission Harness Main Connector.
0173