• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 7. Transmission Case.
Figure 9. Control Solenoids Harness.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  990    991    992    993    994  995  996    997    998    999    1000  
img
.
TM 5-2410-241-23-2
0173
INSTALLATION CONTINUED
N OT E
Install electrical connections and route harness as noted during removal.
4. Install new gasket (Figure 8, Item 1), plate (Figure 8, Item 5), and two bolts (Figure 8, Item 7) on transmission
(Figure 8, Item 8).
5. Position harness (Figure 8, Item 3) in transmission (Figure 8, Item 8).
6. Install new O-ring (Figure 8, Item 2) on main connector (Figure 8, Item 4).
7. Install connector (Figure 8, Item 4) on plate (Figure 8, Item 5).
8. Install nut (Figure 8, Item 6) on main connector (Figure 8, Item 4).
Figure 8. Transmission Harness Main Connector.
0173
0173-9


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.