• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2. Harness.
HORN REPLACEMENT

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1058    1059    1060    1061    1062  1063  1064    1065    1066    1067    1068  
img
. . .
TM 5-2410-241-23-2
0181
CLEANING AND INSPECTION
000181
Clean and inspect all parts IAW Mechanical General Maintenance Instructions (WP 0295).
END OF TASK
INSTALLATION
000181
1. Install new O-ring (Figure 3, Item 3) on sensor (Figure 3, Item 2).
2. Install sensor (Figure 3, Item 2) on hydraulic tank (Figure 3, Item 1).
N OT E
Install electrical connectors and route harnesses as noted during removal.
3. Connect connector (Figure 2, Item 1) to connector (Figure 2, Item 3).
4. Install new tiedown strap (Figure 2, Item 2) on connector (Figure 2, Item 1).
5. Close door (Figure 4, Item 4) on machine.
6. Install plate (Figure 4, Item 1), two washers (Figure 4, Item 3), and bolts (Figure 4, Item 2) on machine.
Figure 4. Door.
0181
END OF TASK
FOLLOW-ON TASKS
000181
1. Install transmission filter (WP 0152).
2. Fill hydraulic tank (WP 0184).
3. Verify correct operation of machine (TM 5-2410-241-10).
END OF TASK
END OF WORK PACKAGE
0181-3/(4 blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.