TM 5-2410-241-23-2
0180
INSTALLATION
000180
N OT E
Install electrical connectors as noted during removal.
Install wiring harness as noted during removal.
Install tiedown strap as noted during removal.
1. Connect winch solenoid harness (Figure 2, Item 1) to winch solenoid connector (Figure 2, Item 3).
3. Install new tiedown strap (Figure 2, Item 4) on winch solenoid harness (Figure 2, Item 1).
Figure 2. Winch Solenoid Harness.
0180
END OF TASK
FOLLOW-ON TASKS
000180
Verify correct operation of machine (TM 5-2410-241-10).
END OF TASK
END OF WORK PACKAGE