• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 10. Switch Pod Connector.
Figure 12. Upper Right Access Panel.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1051    1052    1053    1054    1055  1056  1057    1058    1059    1060    1061  
img
.
TM 5-2410-241-23-2
0179
INSTALLATION CONTINUED
14. Install bolt (Figure 11, Item 2) on upper right access panel (Figure 11, Item 1).
15. Position switch pod (Figure 11, Item 3) on machine.
16. Install two washers (Figure 11, Item 5) and bolts (Figure 11, Item 4) on switch pod (Figure 11, Item 3).
Figure 11. Switch Pod.
0179
0179-10


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.