TM 5-2410-241-23-2
0179
INSTALLATION CONTINUED
N OT E
Install electrical connectors and route harnesses as noted during removal.
12. Position switch pod (Figure 10, Item 1) on machine.
13. Connect three connectors (Figure 10, Item 3) on three switches (Figure 10, Item 2).
Figure 10. Switch Pod Connector.
0179